by phinkle@resourceinstituteinc.org | Aug 20, 2026 | Uncategorized
CRAB CREEK STREAM RESTORATION PROJECT HENDERSONVILLE, NC STATS French Broad Watershed in Hendersonville, NC COMPLETED FEET OF STREAM RESTORED LIVE STAKES PLANTED TREES PLANTED CARBON SEQUESTRATION IN TONS IN 10 YEARS SEDIMENT REDUCTION IN TONS BEFORE AFTER Natural...
by phinkle@resourceinstituteinc.org | May 29, 2025 | 2023, Project
Crab CreekStream Restoration Project After RestorationThe project team used root wads to stabilize a meander bend on Cove Creek. Before RestorationA primary goal of the Crab Creek restoration project was to stabilize steep, eroding streambanks. Crab Creek French Broad...
by phinkle@resourceinstituteinc.org | May 29, 2025 | 2023, Project
Line CreekStream Restoration Project Post ConstructionThe project team used root wads and rock structures to stabilize Linke Creek’s streambanks. Pre-ConstructionOne of the main objectives of the Line Creek restoration project was to stabilize steep, eroding...
by phinkle@resourceinstituteinc.org | May 29, 2025 | 2023, Project
Boyston CreekStream Restoration Project Post ConstructionThe project team utilized root wads and rock structures to stabilize Boyston Creek’s streambanks and redirect stream flows away from the banks Pre-ConstructionBefore restoration, Boyston Creek’s streambanks were...
by phinkle@resourceinstituteinc.org | May 29, 2025 | 2023, Project
Lewis CreekStream Restoration Project Post ConstructionThe project team installed root wads and rock structures to stabilize Lewis Creek’s streambanks. Additionally, they planted live stakes and shrubs to establish a riparian buffer. Pre-ConstructionBefore...