by phinkle@resourceinstituteinc.org | May 29, 2025 | 2023, Project
Crab CreekStream Restoration Project After RestorationThe project team used root wads to stabilize a meander bend on Cove Creek. Before RestorationA primary goal of the Crab Creek restoration project was to stabilize steep, eroding streambanks. Crab Creek French Broad...
by phinkle@resourceinstituteinc.org | May 29, 2025 | 2023, Project
Boyston CreekStream Restoration Project Post ConstructionThe project team utilized root wads and rock structures to stabilize Boyston Creek’s streambanks and redirect stream flows away from the banks Pre-ConstructionBefore restoration, Boyston Creek’s streambanks were...
by phinkle@resourceinstituteinc.org | May 29, 2025 | 2023, Project
Lewis CreekStream Restoration Project Post ConstructionThe project team installed root wads and rock structures to stabilize Lewis Creek’s streambanks. Additionally, they planted live stakes and shrubs to establish a riparian buffer. Pre-ConstructionBefore...