Hodges Creek Stream Restoration Project
Hodges Creek
Fisher River Watershed
Surry County, Dobson, NC
Status: Complete
Stream Restored: ~ 2,700 feet
Planting Stats: 1,300 Trees & 7,200 Live Stakes
Carbon Sequestration over 10 years = 67.7 tons
Soil Erosion Reduction = 397.1 tons
Resource institute’s Partners:
Natural Resource Concern/Issues:
-
Streambanks on Hodges Creek were steep and severely eroded and lacked a riparian buffer
-
Original Stream Type = F
Project Objectives:
-
Restored Stream Type = Bc
-
Improve water quality by reducing sediment, nutrient, organic, and inorganic loading of the stream and reduce streambank erosion
-
Stabilize the stream reach to prevent further aggradation or degradation by providing an improved dimension, pattern and/or profile that will improve sediment transport, and manage surface waters and groundwater levels in floodplains, riparian areas, and wetlands
-
Construct rock and woody structures to provide instream habitat, stabilize streambanks and the channel bed
-
Provide an alternate watering source for livestock that includes pump and livestock pipeline to convey water to watering facilities with surrounding heavy-use area protection
-
Install fencing to restrict livestock access to the stream corridor to protect streambanks and streambank vegetation
-
Establish a riparian buffer and reestablish native plants, trees, and shrub