Lewis Creek Stream Restoration Project
Post Construction
The project team installed root wads and rock structures to stabilize Lewis Creek’s streambanks. Additionally, they planted live stakes and shrubs to establish a riparian buffer.
Lewis Creek
French Broad Watershed
Henderson County, Hendersonville, NC
Status: Completed 2023
Stream Restored: ~3,020 feet
Planting Stats: 3,900 lives takes & 2,600 trees
Carbon Sequestration - 85.1 tons (over 10 years)
Sediment Reduction: 180 tons
Resource Institute’s Partners:
Natural Resource Concerns/Issues
-
Streambanks on Coon Branch & UT Lewis Creek were steep and severely eroded and lacked a riparian buffer
-
Original Stream = Type G4c
Project Objectives:
-
Restored Stream Type = C4
-
Improve water quality by reducing sediment, nutrient, organic, and inorganic loading of the stream and reduce streambank erosion
-
Stabilize the stream reach to prevent further aggradation or degradation by providing an improved dimension, pattern and/or profile that will improve sediment transport and manage surface waters and groundwater levels in floodplains, riparian areas, and wetlands
-
Construct rock and woody structures to provide instream habitat, stabilize streambanks and the channel bed
-
Provide an alternate watering source for livestock, including a pump and livestock pipeline to convey water to watering facilities and protect the surrounding heavy-use area.
-
Install fencing to restrict livestock access to the stream corridor to protect streambanks and streambank vegetation
-
Establish a riparian buffer, remove invasive plant species, and reestablish native plants, trees, and shrubs