Little Crabtree Creek Restoration Project

Little Crabtree Creek

Watershed – North Toe River
Yancey County, Burnsville, NC
Status: Complete
Stream Restored: ~3,300 feet

Partners:

Resource Concern/Issues:

Little Crabtree Creek was actively migrating with an unstable channel bed and eroding streambanks. Additionally, it lacked sinuosity, a sufficient riparian buffer, and aquatic habitat.

Project Objectives:

  • Improve water quality by reducing sediment, nutrient, organic, and inorganic loading of the stream and reduce streambank erosion

  • Stabilize the stream reach to prevent further aggradation or degradation by providing an improved dimension, pattern and/or profile that will improve sediment transport, and manage surface waters and groundwater levels in floodplains, riparian areas, and wetlands

  • Construct rock and woody structures to provide instream habitat, stabilize streambanks and the channel bed

  • Install fencing to restrict livestock access to the stream corridor to protect streambanks and streambank vegetation

  • Establish a riparian buffer, remove invasive plant species and reestablish native plants, trees, and shrubs