North Toe River (Upper Reach) Stream Restoration Project

North Toe River (Upper Reach)

North Toe River – Upper Reach
French Broad River Watershed
Avery  County, Newland, NC
Status: Complete
Stream Restored: ~ 2,500 feet
Planting Stats: 4,760 livestakes & 826 trees
Carbon Sequestration:  21.1 tons
Sediment Reduction: 57 tons

Resource Institute’s Partners:

Natural Resource Concerns/Issues

  • Streambanks on UT North Toe River were steep and severely eroded and lacked a riparian buffer

  • Original Stream = C4b

Project Objectives:

  • Restored Stream Type = C4b

  • Improve water quality by reducing sediment, nutrient, organic, and inorganic loading of the stream and reduce streambank erosion

  • Stabilize the stream reach to prevent further aggradation or degradation by providing an improved dimension, pattern and/or profile that will improve sediment transport and manage surface waters and groundwater levels in floodplains, riparian areas, and wetlands

  • Construct rock and woody structures to provide instream habitat, stabilize streambanks and the channel bed

  • Establish a riparian buffer, remove invasive plant species, and reestablish native plants, trees, and shrubs

  • Enhance flood resiliency by improving the stream’s capacity to manage high-flow events, reducing the risk of flooding, and protecting surrounding infrastructure and habitats through strategic floodplain reconnection and the installation of flood-tolerant vegetation