Webb Creek Stream Restoration Project
Nature Based Solutions
The project team employed nature-based solutions, including root wads and instream structures, to stabilize and enhance Webbs Creek’s ecological functions.
Webb Creek
Webbs Creek
Broad River Watershed
Rutherford County, Lake Lure, NC
Status: Complete
Stream Restored: ~1,125 feet
Planting Stats: 2,228 livestakes & 386 trees
Carbon Sequestration: 20.5 tons
Sediment Reduction: 340 tons
Resource Institute’s Partners:
Natural Resource Concerns/Issues
-
Streambanks on Webb Creek were steep and severely eroded and lacked a riparian buffer
-
Original Stream = Type G4
-
Streambanks on Webb Creek were steep and severely eroded and lacked a riparian buffer
Project Objectives:
-
Restored Stream Type = G4
-
Improve water quality by reducing sediment, nutrient, organic, and inorganic loading of the stream and reduce streambank erosion
-
Stabilize the stream reach to prevent further aggradation or degradation by providing an improved dimension, pattern and/or profile that will improve sediment transport and manage surface waters and groundwater levels in floodplains, riparian areas, and wetlands
-
Construct rock and woody structures to provide instream habitat, stabilize streambanks and the channel bed
-
Provide an alternate watering source for livestock, including a pump and livestock pipeline to convey water to watering facilities and protect the surrounding heavy-use area.
-
Install fencing to restrict livestock access to the stream corridor to protect streambanks and streambank vegetation
-
Establish a riparian buffer, remove invasive plant species, and reestablish native plants, trees, and shrubs

